What we did in 2000
Our assignment for 2000 was to complete the kitchen and dining room.
|
We paid for local tradesmen to plaster walls and
fit double glazing. |
Hundreds of tiles were put on the kitchen and
toilet walls. |
|
|
|
|
Power and lighting circuits were installed. Skirtings, door frames and doors fitted. |
Walls were painted ready for the murals. |